NO PROJECT
NAME
CLIENT SCOPE OF
WORKS
COIL & REFRACTORY
LINING MAT'L
DELI
-VERY
RE
-MARKS
COIL REFRAC
-TORY
1 BANDAR ABBAS Gas Condensate Refinery Project / PGSOC
/ Iran
PGSOC Shop Fabrication of Convection Modules & Radiant pipe and Panel for 24 Heaters
Steel (2149.3 ton), Coil (113,111 D.I.) and Refractory Lining
- A335 P9
- A312 TP310 & TP304
- A376 TP321
- CASTABLE
- C.F. Blanket
Feb 25, '12 Hanil
Industries
2 SKEC Ruwais Refinery Expansion Project
/ U.A.E.
Takreer Shop Fabrication of Reformer for Takreer Project
Steel (1,463 ton), Coil (20,926 D.I.) and Refractory Lining
- A335 P11
- A312 TP304 / TP347
- CASTABLE Sep 30, '11 ITT
3 SKEC Ruwais Refinery Expansion Project
/ U.A.E.
Takreer Shop Fabrication of Reformer for Takreer Project
Steel (899.6 ton), Coil (16,066 D.I) and Refractory Lining
- A335 P9
- A312 -TP347H
- A106 Gr.B
- C.F.Blanket
- CASTABLE
Aug 15, '11 PCK
4 REFOCAR CARTAGENA REFINERY EXPANSION PROJECT
/ COLUMBIA
REFICAR / C&I / LTHT SHOP FABRICATION OF TWO DELAYED COKER HEATER
STEEL (415.1 TON) AND REFRACTORY LINING
- A335 P9 / P11 - C.F.BLANKET
- CASTABLE
MAR 25, '11 JNK
5 S-OIL REFINERY EXPANSION PROJECT / KOREA S-OIL FABRICATION & ERECTION OF FIRED HEATERS (4 HEATERS)
STEEL (1,193.3 TON), COIL (23,673 D.I.) AND REFRACTORY LINING WITH FIELD ERECTION
- A335 P22
-A106 GR.B
- C.F. BLOCK & BLANKET
- CASTABLE
JUL 31, '10 PCK
6 HDO #2 HOU PROJECT / KOREA HYUNDAI OIL BANK FABRICATION & ERECTION OF TUBULAR REFORMER
STEEL (1,509.0 TON), COIL (14,290 D.I.) AND REFRACTORY LINING
- A335 P11 / P22
- A312 TP304H
- A106 GR.B
- C.F. BLOCK & BLANKET
- CASTABLE
DEC 31, '10 PCK
7 WOOD RIVER CORE PROJECT / USA CONOCOPHILLIPS FABRICATION OF HDT HEATER, VACUUM HEATER & COKER HEATERS
STEEL (1,545.1 TON), COIL (17,498 D.I.), REFRACTORY LINING & FULL MODULARIZATION
- A335 P9/11
-A312 -TP317/347
- C.F MODULE
- CASTABLE
MAY 31, '09 KTI KOREA
8 CBU PROJECT
/ JAPAN
COSMO ENGINEERING FABRICATION OF REFORMER & HDS HEATER
STEEL (565.6 TON), COIL (5,985 D.I) AND REFRACTORY LINING
- SA335 P11
- SA312 TP347H
- SA210 GR.A1
- INSULATING
BOARD
- CASTABLE
MAR 01, '09 FEI
9 MOTIVA CRUDE EXPANSION PROJECT
/ U.S.A.
MOTIVA ENTERPRISE LLC. SHOP FABRICATION OF SIX (6) REACTOR CHARGE HEATER
STEEL (758.7 TON), COIL (12,400 D.I) AND REFRACTORY LININIG
- A335 P9, P11
- A312 TP347
- A106 GR.B
- C.F.B.
- CASTABLE
DEC 20, '08 PCK
10 NO.2 FCC PROJECT / KOREA SK CORPORATION FABRICATION AND ERECTION OF REFORMER
STEEL (1,073 TON), COIL (10,392 D.I) AND REFRACTORY LINING
- A335 P22
- INCOLOY 800H
- TP304H
- INSULATING BLOCK
- C.F MODULE
- CASTABLE
DEC, '07 ITT
11 RIPE-X (B) PROJECT
/ JAPAN
JAPAN ENERGY CORPORATION
KASHIMA REFINERY
FABRICATION OF ONE XYLEN RERUN COLUMN REBOILER AND 2 REACTOR FEED HEATERS
STEEL (890 TON), COIL (15,082) AND REFRACTORY LINING
- STF 410
- STFA 24
- C.F BLANKET
- CASTABLE
MAR, '07 CHIYODA
12 RABIGH PROJECT OLEFIN PLANTS PROJECT
/SAUDI ARABIA
PETRO-RABIGH FABRICATION OF CONVECTION MODULE & SPIRAL FINNING FOR 9 CRACKING FURNACE
STEEL (732 TON), COIL (5,454 D.I FOR CONV / 1,728 D.I FOR C.W) AND REFRACTORY LINING
- B407 800HT
- A312 TP304H
- A106 GR.B
- INSULATING BLOCK
- CERAMIC FIBER
- CASTABLE
AUG.'06
OCT.'06
DEC.'06
JGC
13 IPEC/IDEMITSU TR-3 PROJECT
/ JAPAN
IDEMITSU
PETROCHEMICAL


CO., LTD.
FABRICATION OF MILLISECOND PYROLYSIS FURNACE
STEEL (537 TON), COIL (5,685 D.I) AND REFRACTORY LINING
- SUS374HTF
- SUS304HTF
-FT410
-INCONEL 601
-25Cr35Ni NB
- FIRE BRICK
- CERAMIC FIBER
- CASTABLE
APR.'06
MAY.'06
FEI
14 JCP PROJECT
/ SAUDI-ARABIA
JUBAIL CHEVRON
PHILLIPS COMPANY
FABRICATION OF CONVECTION MODULES FOR 4 CRACKING FURNACES (20 MODULES)
STEEL (337 TON) AND COIL (9,424 D.I)
- ALLOY 800H
- A335 P11
- A312 TP304H
FEB.'06 JGC
FABRICATION OF STEEL STRUCTURE FOR 4 CRACKING FURNAC
STEEL (1,256 TON)E
NOV.'05
15 K2E FURNACE EXPANSION PROJECT
/ JAPAN
MITSUBISHI CHEMICAL
CORPORATION
FABRICATION OF CONVECTION MODULE FOR PYROLYSIS FURNACE
STEEL (100 TON), COIL (6,238 D.I) AND REFRACTORY LINING

- SA335P22
- A234WP11
- SA312
TP304H

- CASTABLE
- TR-BLOCK
JUL.'05 CHIYODA
FABRICATION OF STEEL STRUCTURE FOR 4 CRACKING FURNACE
STEEL (1,256 TON)
NOV.'05
16 K2E FURNACE EXPANSION PROJECT
/ JAPAN
MITSUBISHI CHEMICAL
CORPORATION
FABRICATION OF CONVECTION MODULE FOR PYROLYSIS FURNACE
STEEL (100 TON), COIL (6,238 D.I) AND REFRACTORY LINING
- SA335P22
- A234WP11H
- SA312
TP304H
- CASTABLE
- TR-BLOCK
JUL.'05 CHIYODA
FABRICATION OF FURNACE STEEL STRUCTURE
STEEL (420 TON)
AUG.'05 CHIYODA
17 SK-NRC PROJECT
/ KOREA
SK CORP. FABRICATION & ERECTION OF REACTOR FEED HTR, AROMIZING HTR & XYLENE COLUMN REBOILER
STEEL (786 TON), COIL (16,681 D.I) AND REFRACTORY LINING
- A312TP304H
- A106GR.B
- A335P11
/P22/P91
- CASTABLE
- C.F.B.
SEP.'05 JNK
18 HDO CLEAN FUEL
PROJECT
/ KOREA
HYUNDAI OIL BANK FABRICATION & ERECTION OF TUBULAR REFORMER
STEEL (515 TON), COIL (2,664 D.I) & REFRACTORY LINING
- A335P11, P22
- TP304H
- CASTABLE
- C.F.B.
- C.F.WOOL
JUL,'05 FEI
19 CAPROLACTAM
EXPANSION PROJ. II
/ KOREA
CAPRO CORPORATION REFORMER PACKAGE
STEEL (480 TON), COIL(9,832 D.I) AND REFRACTORY LINING
- F321H
- A335P11/P22
- TP304H
- FIRE BRICK
- CERABLOCK
- LW CASTABLE
DEC,'03 HDEC
20 JUPC ETHYLENE
PLANT PROJECT
/ JUBAIL,
SAUDI ARABIA
JUBAIL UNITED PETROCHEMICAL
COMPANY
CONVECTION MODULES
STEEL (464 TON), COIL (25,872 D.I) AND REFRACTORY LINING
- A312TP304H
- SA182TP304H
- SA182F11
- CASTABLE APR, '03 CHIYODA
21 REFAP SECOND
EXPANSION PROJECT
/ URFCC UNIT, BRAZIL
PETROBRAS WASTE HEAT EXCHANGER
STEEL (449 TON), COIL (17,680 D.I) AND
REFRACTORY LINING
- SA234WP11
- SA234WPB
- CASTABLE SEP, '02 FEI
/ TEC
22 IDEMITSU TOKUYAMA
TS-PROJECT
/ JAPAN
IDEMITSU
PETROCHEMICAL
CO., LTD.
MILLISECOND FURNACE
STEEL (410 TON), COIL (3,190 D.I) AND
REFRACTORY LINING
- SUS374HTF
- SUS304HTF
- FT410
- FIRE BRICK
- CERAMIC
FIBER
- CASTABLE
APR, '02 IDEMITSU
ENGINEERING
23 ALKOS 2000 PK-2000
PROJECT
/ KOREA
AIR LIQUIDE KOREA SERVICE CO., LTD. H-2111 REFORMER
STEEL (488 TON), COIL (5,076 D.I) AND
REFRACTORY LINING & ERECTION
- A335 P11, P22
- A312 TP304, TP321H
- A106 GR.B
- FIRE BRICK
- CERAMIC
FIBER
- CASTABLE
SEP, '02 SECL
24 NRP REVAMPING
PROJECT
/ KOREA
SK CORPORATION CCR HEATER, STRIPPER REBOILER & AIR COMMON DUCT, ETC.
STEEL (495TON), COIL (14,244 D.I) AND
REFRACTORY LINING (245 M3)
- A335P9, P11 & P22
- A671P22
- A106 GR.B
- CASTABLE
- CERAMIC
FIBER
- ROCKWOOL
SEP, '01 NIIGATA
25 ETHYLENE PLANT
/ QATAR
Q-CHEM RADIANT MODULE, STACK, DUCT, BURNER PIPING, STACK,
BREECING AND TRANSITION DUCT MODULES WITH REFRACTORY
LINING FOR 5 CRACKING HEATERS
STEEL (684TON), COIL (11,620 D.I)
- C.S - CASTABLE
- FIRE BRICK
OCT. '00 TECHNIP
26 DUCT FABRICATION
WITH INSULATION
/ JAPAN
CHUBU ELECTRIC POWER PLANT STEEL FAB. (402 TON) AND INSULATION (2,488 M2)
FOR DUCT
  - ROCK WOO
- SILICONE L
NOV. '99 IHI
27 AMJ PROJECT/2000
MTPD AMMONIA
PLANT
/ INDONESIA
MHI/P.T.KALTIM
PASIFIK AMONIAK
STEEL STRUCTURE(588 TON), COIL FAB.(11,398 D.I),
REF.LINING(180 M3),CONV.MODULING(7 BLOCKS),
INLET DISTRIBUTOR AND COLD COLLECTOR FOR
PRIMARY REFORMER
- A106 GR.B
- TP321H
- P11
- P22
- CASTABLE NOV.'98 MHI
/ FEI
28 NO.2 CCR
PLATFORMING
UNIT, MURORAN
REFINERY
/ HOKKAIDO, JAPAN
NIPPON OIL ENG'G
CO., LTD.
STEEL FAB.(553 TON) FOR CHARGE HEATER     AUG.'98 JGC
29 MSF EXPANSION
PROJECT
/ TOKUYAMA, JAPAN
IDEMITSU
PETROLEUM
CHEMICAL CO.
STEEL FAB.(529 TON),COIL FAB.(1,200 D.I),REF.LINING
(43 M3) AND CONVECTION MODULING (3 BLOCKS) FOR
MILLISECOND PYROLYSIS FURNACE
- STF410
- SUS304 HTF
- CASTBLE
(T/#5903,
LHV=1:2:4)
- DIATOMUCEOUS
EARTH BLOCK
JULY '98 KHI
30 TITAN NO.2 CRACKER PROJECT
/ MALAYSIA
TITAN PETRO-
CHEMICALS (M)
SDN. BHD
24 CONVECTION MODULES AND EXTERNAL PIPINGS
FOR 6 CRACKING FURNACE (ITEM NO. 2H-110/111/112/113/114/115)
- A106 GR.B
- 1-1/4 CR.
- A312 TP304H
- ALLOY 800H
- CASTABLE
- SILICA BOARD
- C.F BLANKET
APR.'98 JGC
/ FEI
31 CAPC EXPANSION
PROJECT
/ INDONESIA
P.T CHANDRA ASURI SHOP DRAWINGS AND STEEL STRUCTURE (700 TON)
FOR CRACKING HEATERS
    JAN.'98 TEC
32 TUBAN
PETROCHEMICAL
COMPLEX PROJECT
/AROMATICS PLANT
/ INDONESIA
P.T.TRANS-PACIFIC
PETROCHEMICAL
INDOTAMA
41 CONVECTION MODULES FOR 13 HEATERS
CONDENSATE SPLITTER REBOILER, PRECUT
COLUMN REBOILER,CHARGE HEATER,DEHEPTANIZER
REBOILER, XYLENE RERUN COLUMN REBOILER,
XYLENE SPLITTER REBOILER AND HEAVY AROMATIC
COLUMN REBOILER, ETC.)
- A106 GR.B
- A335 GR.P11
- A182 GR.F11
- A335 GR.P22
- A182 GR.F9
- CASTABLE OCT.'97 JGC
33 SXC (SSANGYONG
XYLENE CENTER)
PROJECT
/ ONSAN, KOREA
SSANGYONG OIL
REFINING CO., LTD.
SHOP DRAWING, STEEL STRUCTURE (1,350 TON),
COIL FAB. (21,866 DI), REF. LINING & ERECTION FOR
7 V/C TYPE HEATERS (HOT OIL HEATER, REACTOR
CHARGE HEATER & XYLENE COLUMN REBOILER)
- A106 GR.B
- A335 P22
- A335 P11
- FQFB
- CASTABLE
(LHV = 1:2:4,
LV = 1:6)
- C.F BLANKET
- M.W BLANKET
JUNE '97 DEC
34 TAEKWANG ANP PROJECT
/ ULSAN, KOREA
TAEKWANG
INDUSTRIAL
CO., LTD.
SHOP DRAWING, STEEL STRUCTURE (638 TON).
COIL FAB., REF. LINING & ERECTION FOR OLEFLEX
UOP HEATER (PROPANE DEHYDROGENATION
HEATER)
- A376 TP347H
- SA106 GR.B
- SA335 P11
- FQFB
- CASTABLE (LHV=1:2:4)
- C.F BLANKET
- M.W BLANKET
AUG.'96 DEC
35 NEP REVAMP
PROJECT
/ ULSAN, KOREA
YUKONG LIMITED STEEL STRUCTURE (826 TON), COIL FAB.,
REFRACTORY LINING & ERECTION FOR
MILLISECOND FURNACES
- HK4M
- INCONEL 601
- A182 F347H
- A312 TP347H
- A403 WP347H
- A240 TP304H
- A182 F304H
- A312 TP304H
- SA312 TP304H
- SA335 P22
- SA234 WPB
- SA234 WP22
- A335 P11
- A106 GR.B
- IFB
(1,427¡É, 1,538¡É)
- C.F MODULE
- C.F BLANKET
- C.F BOARD
- D.E. BLOCK
- CASTABLE
AUG.'96 NIIGATA
36 NO.5 CDU PROJECT
/ ULSAN, KOREA
YUKONG LIMITED SHOP DRAWING, STEEL STRUCTURE (555 TON), COIL
FAB. & REFRACTORY LINING FOR CRUDE HEATER
& MDU REACTOR HEATER
- A335 P5
- A335 P9
- A335 P11
- A234 WP9
- A271 TP347H
- CASTABLE
(KL 2000HS, LHV=1:2:4, LV=1:6)
FEB.'96 SKEC
37 YUKONG FCC PROJECT
/ ULSAN, KOREA
YUKONG LIMITED STEEL STRUCTURE (580 TON), COIL FAB.,
REFRACTORY LINING & ERECTION FOR REFORMER
FURNACE
- A312 TP321H
- A240 GR.321
- A312 TP304H
- A335 P22
- A182 F321H
- A335 P11
- A182 F11
- A182 F22
- A106 GR.B
- A234 WPB
- FIRE BRICK
(SK-34)
- C.F MODULE
(FOLDED)
- CASTABLE
(INCT 120S)
- CALCIUM
SILICATE
DEC.'95 CHIYODA
38 CYCLONES FOR BCC PROJECT
/ ONSAN, KOREA
SSANGYONG OIL
REFINING CO., LTD.
FABRICATION OF 34 SETS OF CYCLONES (A516-70,
TP304H, 160 TON)
  - EROSION RESISTANT
CASTABLE
- INSULATING CASTABLE
- HEX MESH (405, 410S)
SEPT.'95 JGC
39 HAINAN AMMONIA
PROJECT
/ HAINAN, CHINA
CNTIC/CNCCC
/FUDAO CHEMICAL
INDUSTRIAL CORP.
STEEL FAB. (345 TON) FOR PRIMARY REFORMER
& START-UP-HEATER
- A335 P9
- A335 P11
- A106 GR.B
- A312 TP310
- A312 TP347H
  MAR.'95 CHIYODA
/ FEI
40 NPC EXPANSION
PROJECT
/ THAILAND
NATIONAL
PETROCHEMICAL
CORPORATION
STEEL STRUCTURE (427 TON), COIL FAB. &
REFRACTORY LINING FOR 2 CRACKING HEATERS
- SA210 A1
- A106 GR.B
- A335 P11
- A335 P22
- A335 P5
- A312 TP304
- INSULATION FIRE BRICK
- MINERAL FIBER
- CASTABLE
- C.F BLANKET
JUNE '94 DEC
41 NIOC PROJECT
/IRAN
NATIONAL IRANIAN
OIL COMPANY
FURNACE STEEL CASING & STRUCTURE (900 TON)
FOR CCR REFORMER
    JUNE '92 CHIYODA
/ FEI
42 MARUZEN ETHYLENE
PLANT
/ JAPAN
MARUZEN
PETROCHEMICAL
CO., LTD.
CONV. PARTS & STEEL STRUCTURE (400 TON).     APR.'92 TEC/FEI
43 TNC PROPANE DEHYDRO.
PLANT
/ ULSAN, KOREA
TONGYANG NYLON
CO., LTD.
STEEL FAB. (380 TON), COIL FAB., REFRACTORY
LINING & FIELD ERECTION FOR TUBULAR REFORMER
- A376 TP347H
- A106 GR.B
- A335 P11
- C.F BLANKET
- CASTABLE
- FIRE BRICK
NOV.'90 CHIYODA
44 YUKONG HOU PLANT
/ ULSAN, KOREA
YUKONG LIMITED STEEL FAB. (500 TON), COIL FAB., REFRACTORY
LINING & FIELD ERECTION FOR VACUUM CHARGE
HEATER AND COMMON DUCT
- A335 GR.P5
- A335 GR.P11
- C.F BLANKET
- CASTABLE
- ACID PROOF CASTABLE
- FIRE BRICK
SEPT.'90 NIIGATA
DEC
45 SSANGYONG BTX
PLANT
/ ONSAN, KOREA
SSANGYONG OIL
REFINING CO., LTD.
STEEL FAB. (380 TON), COIL FAB. & REFRACTORY
LINING FOR 5 V/C TYPE HEATERS
- A321 TP321
- A106 GR.B
- C.F BLANKET
- CASTABLE
SEPT.'90 LHTS
46 YUKONG PX PLANT
/ ULSAN, KOREA
YUKONG LIMITED STEEL FAB. (400 TON), COIL FAB., REFRACTORY
LINING & FIELD ERECTION FOR XYLENE STRIPPER
REBOILER, REACTOR FEED HEATER AND
DEHEPTANIZER REBOILER
- A672 GR.B
- A106 GR.B
- A312 TP310
- A335 P11
- A335 P22
- A691 GR.1-1/4CR
- C.F BLANKET
- CASTABLE
- FIRE BRICK
OCT.'89 CHIYODA
47 HONAM BTX PLANT
/ YEO CHON, KOREA
HONAM OIL
REFINERY CO., LTD.
STEEL FAB. (315 TON), COIL FAB. & REFRACTORY
LINING FOR CHARGE HEATER, DEHEPTANIZER
REBOILER AND STRIPPER BOILER
- A106 GR.B
- A312 TP310
- A335 P11
- A335 P22
- C.F BLANKET
- CASTABLE
SEPT.'89 KTI